Every project raised the cost of being wrong.
A mistake in a villa is an afternoon. A mistake in an operating plant is a shutdown. The work did not just get bigger — it got less forgiving, and that is what pushed the tooling forward.
BIM Modeler / MEP Draftsman
Villas, towers, malls, hotels, offices and airport renovation works. Shop, coordination, builder's work and as-built drawings, through consultant approval. Supervised drafting teams and coordinated daily with other disciplines. This is where the AutoLISP routines and Dynamo scripts started.
Learning exactly where models breakBIM Modeler · Arab Engineering Bureau
Revit MEP models for HVAC, plumbing, firefighting and drainage across fourteen school buildings, federated on Autodesk Construction Cloud with clash detection in Navisworks. Coordination drawings, schedules and quantity take-offs produced straight from the model.
Get the standard right once, or fix it fourteen timesBIM Specialist & MEP BIM Coordinator · Trags
Lead HVAC BIM modelling and coordination on an operating production plant, in Revit with BIM 360. Navisworks clash detection driven to closure with MEP, structural and civil teams, and LOD and project BIM standards enforced across the federated model at every milestone. The custom Revit tools I rolled out to the drafting team cut project timelines by 20%.
Shutdown risk, not rework riskLooking for an MEP BIM Coordinator?
Doha, Qatar · transferable QID with NOC · able to join within days.